Features Behind the Problems in Work with Agents
This note asks what is underneath the problems in Problems in Engineering Work with Agents. It uses the numbers of that list, and the layers and links of Sequences of Problems in Engineering Work with Agents.
A feature is a fact about the work, about people, or about agents that the team doesn’t control. A problem is what happens when the team’s way of working doesn’t allow for a feature. So a team can reduce a problem, and it has to work with a feature. The word comes from the working model, which derives its processes from the features of the participants and of the work.
I gave each problem one or two features. The features and the assignment are my reading of how the problems are worded. No case from our work is behind them.
Sixteen Features
91 of the 94 problems trace back to at least one of these features.
About the Work
About People
About Agents
The first ten features hold in a team without agents. The last six are features of agents. W7 was added later than the others, with problems 92 to 94.
How the Features Fit the Layers
The table counts the problems in each layer that have a feature of each kind. A problem with two features can count twice.
- Layer 1 needs no feature of agents. All 29 problems trace back to features of the work and of people. I wrote the layer 1 rows without the agent, so this mostly confirms that split.
- Layer 2 is where a feature of agents comes in. 34 of its 40 problems have one. Three of the other six are old problems of anything a team maintains, now showing up in the agent setup: its lines contradict each other (68), a slow check gets turned off (73), and one person understands it (80). The last three have no feature (13, 34, 72).
- Layer 3 rests mostly on four features: the value of the work is hard to count (W5, 10 problems), an agent’s behavior isn’t fixed (A4, 6), every task is different (W2, 6), and the result depends on many things (W7, 6).
Where a Feature of Agents Meets an Older One
The links from layer 2 into layer 1 show where a feature of agents meets a feature that was already there. Four meetings account for 12 of those 17 links.
Layer 3 has one meeting of its own. Every task is different (W2), and an agent’s behavior isn’t fixed (A4). Four problems have both features (48, 49, 64, 81): two results can’t be compared directly, because the task changed and the agent may have changed too. W7 is the general form of this meeting: the task and the agent are two of the many things a result depends on.
What the Starts Are
The sequences have 29 starts: problems with links going out and none coming in. They’re of four kinds.
So eight rows of the list are features, such as “tasks don’t repeat” (50) and “the code looks tidy whether it’s right or wrong” (37). Nothing a team does removes them.
Comparison with the Working Model
The working model already has a list close to this one: the features in Processes Derived from the Goals and the Participants. The processes are derived from it. The table shows what that list had before this note.
Six features were missing from the model: W2, W3, W5, W6, A4, and A6. They’ve been added to its list of features. Three of them, W2, W5, and A4, are among the four that layer 3 rests on. The model had no process for telling whether a change helps, and it also lacked the features that such a process would be derived from. A tenth process, checking whether a change helped, was then added for W2, W5, and A4.
W7 came later, with problems 92 to 94. It was missing from the model too, and it’s the fourth feature that layer 3 rests on. It has been added to the model’s list, and the tenth process now names it.
One feature in the model has no problem in the list: the capability of agents keeps growing.
What Doesn’t Fit
- Three problems have no feature: the agent explains its work in words the developer can’t follow (13), nothing marks the agent’s changes (34), and several harnesses are kept in sync by hand (72).
- Four assignments are weak: doing more than asked (11) and a change applied with no rollback plan (91) under P3, the developer judging their own work (42) under A4, and dependencies nobody decided on (86) under W6.
- W7 fits half of its problems by construction. Problems 92 to 94 state the feature as problems, so their fit says little. The other three are older rows of the list: the cause of a bad result can’t be told (44), several things change at once (52), and a new version is found out by accident (54). Problem 44 moved to W7 from A4.
- Two features have one problem each: W3 and A6.
Open Questions
- Is each feature one thing? A4 puts together differences between runs, between the people steering, and between versions.
- Do the features of agents stay? The model says the capability of agents keeps growing, so some of the six may weaken.
- Do W3, W6, and A6 need a process of their own, or do the existing ones cover them?
- Is W7 one feature or three? It puts together many things, hidden things, and effects that depend on each other.