Engineering Activities
An activity is a kind of engineering work with its own output, context, and definition of done. This note defines the six activities in general terms, so the definitions hold in any project. Each project then implements them in its own way. Engineering Workflows gives the overview, and Cycles in Engineering Work describes the cycles the activities belong to. The Bottom-Up Approach tests these definitions against real tasks, which combine activities into task types. The activities first appeared as “types of work” in step 6 of the Reasoning Log; step 10 there explains why they’re in their own note.
The Six Activities
Each activity can serve discovery (reducing uncertainty that matters to a decision), delivery (building, verifying, releasing, and operating behavior people can rely on), or both.
- Problem & Opportunity Framing: Understanding who is affected, what needs to change, what the product should promise (and not promise), and what open questions remain.
- Investigation & Uncertainty Reduction: Identifying which assumptions could break the plan and testing them against the real code, data, contracts, or running system before committing.
- Trade-off Analysis & Design Decisions: Comparing useful alternatives against real constraints (data ownership, consistency, retries, failure handling, cost) and deciding what implementation must preserve.
- Implementation: Writing the code, configuration, migrations, and tests to fulfill the agreed design.
- Verification & Review: Checking that the change actually works–including failure paths, callers, and edge cases–independently of the author’s assumptions.
- Release, Operation & Learning: Deploying with clear limits, monitoring, rollback/recovery, and feeding production evidence back into the next decision.
An activity can be one step of a larger change or a task on its own, such as investigating an incident. Skills that support each activity are listed in the Reading Map.
Outputs, Context, and Acceptance for Each Activity
Each activity produces a different output, needs different context from the environment, and has its own definition of done.
Row 6 covers only environment and knowledge upkeep. The release and operation part of activity 6 has no row yet.
The Cycle Inside Each Activity
Inside each activity, the reasoning goes through the four parts of the problem-solving cycle: frame, choose, act, and look back and learn. The table shows what each part looks like in each activity. Features of a Good Approach lists the practices for each part, with examples for each activity.
Shortcut vs. Deliberate Assistant Use in Each Activity
When a team uses a coding assistant deliberately across activities, the assistant’s job in each activity differs from the “generate and accept” shortcut:
Activities in Each Phase
The Project Design and Delivery Cycle defines a phase as “a configurable grouping of related activities oriented toward a delivery objective or decision.” A phase is a period in a project’s life, and an activity is a kind of work. Every phase can use every activity, so each activity is defined once above. The table shows which activities each phase uses most and what objective or decision ends the phase.
The phase sets the standard for an activity: how much evidence it needs, how much exposure is acceptable, and which obligations apply. An investigation during framing can use a quick prototype. An investigation during operation works against a production system and needs more care. Teams can start at any phase, and later evidence can send work back to an earlier one.
A Project’s Version of an Activity
The definitions above hold in any project. Each project implements each activity in its own way. A project’s version of an activity states:
- Sources of truth: which docs, contracts, and data the activity reads, and which one wins when they disagree.
- Commands and tools: how to run the system, reproduce a problem, run checks, or deploy.
- Checks: which checks must pass and which failure modes need a test.
- Owners and escalation: who decides what, and when the agent must stop and ask.
- Local definition of done: what the output must contain and what evidence it needs.
The column “What the Agent Needs from the Environment” in the outputs table lists what each activity needs in general. A project’s version names where those things are in that project. It lives in the project’s docs, command catalog (Taskfile), and checks, and AGENTS.md routes the agent to it with its three jobs: where to look, what differs here, and what done means (step 8 of the Reasoning Log).
A short template for one activity:
## Investigation in <project>
- Sources of truth:
- Commands and tools:
- Checks:
- Owners and escalation:
- Done means:Open Questions
- The outputs table has no row for release and operation; its sixth row covers only upkeep.
- The outputs table still uses fuller labels (such as Investigation & Diagnosis and System Design & Planning) than the short activity names used in the cycle and shortcut tables above.
- Phase 3, baseline and prototyping, has no description in the source note, so its row above is inferred.